Coming Up

November 6, 2026

Preliminary Design Review (PDR)

February 19, 2027

Critical Design Review (CDR)

March 26, 2027

Flight Readiness Review (FRR)

Log

Latest updates

Milestone

System Requirements Review

Walked through team overview, system architecture, and the full requirements tree (competition → system → subsystem) for the SUAS 2027 vehicle. Identified mass, mission time, autonomy, and wind as the top design drivers.

Milestone

Requirements Baseline Set (SRR)

Established the mission needs and feasibility baseline ahead of Preliminary Design Review. This freezes the starting point for subsystem scoping.

Team

Mass Meeting — Kickoff for SUAS 2027